PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

3rd floor sprinkler main raiser Facing North-East.jpg Column Line E-1 3rd Floor.jpg Erecting the stone panels at the 4th floor West Elevation.jpg Installing 3rd floor sprinkler raiser Facing West.jpg Pipe hangers at the 4th floor Facing South.jpg VAV Boxes 4.jpg Column Line E-1 4th Floor.jpg Erecting the stone panels at the West Elevation.jpg Installing duct work hangers at the 4th floor Facing West.jpg
Previous pageNext page Pipe hangers at the 4th floor Facing South
Pipe hangers at the 4th floor Facing South